Basic Cable Guides
3 meter
2 meter
110 mm
steel
20 kg
black
powder coated
Assembled on order (3-5 days)
5 meter
2 meter
110 mm
steel
27 kg
black
powder coated
Assembled on order (3-5 days)
7 meter
2 meter
110 mm
steel
33 kg
black
powder coated
Assembled on order (3-5 days)
9 meter
2 meter
110 mm
steel
40 kg
black
powder coated
Assembled on order (3-5 days)
4 meter
3 meter
104 mm
steel
22 kg
black
powder coated
Assembled on order (3-5 days)
5 meter
3 meter
104 mm
steel
25 kg
black
powder coated
Assembled on order (3-5 days)
6 meter
3 meter
104 mm
steel
28 kg
black
powder coated
Assembled on order (3-5 days)
7 meter
3 meter
104 mm
steel
32 kg
black
powder coated
Assembled on order (3-5 days)
8 meter
3 meter
104 mm
steel
35 kg
black
powder coated
Assembled on order (3-5 days)
9 meter
3 meter
104 mm
steel
39 kg
black
powder coated
Assembled on order (3-5 days)
10 meter
3 meter
104 mm
steel
42 kg
black
powder coated
Assembled on order (3-5 days)
11 meter
3 meter
104 mm
steel
45 kg
black
powder coated
Assembled on order (3-5 days)
12 meter
3 meter
104 mm
steel
49 kg
black
powder coated
Assembled on order (3-5 days)
14 meter
3 meter
104 mm
steel
52 kg
black
powder coated
Assembled on order (3-5 days)
14 meter
4 meter
104 mm
steel
55 kg
black
powder coated
Assembled on order (3-5 days)
15 meter
4 meter
104 mm
steel
58 kg
black
powder coated
Assembled on order (3-5 days)
16 meter
4 meter
104 mm
steel
61 kg
black
powder coated
Assembled on order (3-5 days)
17 meter
4 meter
104 mm
steel
64 kg
black
powder coated
Assembled on order (3-5 days)
20 meter
4 meter
104 mm
steel
73 kg
black
powder coated
Assembled on order (3-5 days)
420 x 115 x 20 mm
steel
1.23 kg
black
powder coated
Assembled on order (3-5 days)
Basic Cable Guides
3 meter
2 meter
110 mm
steel
20 kg
black
powder coated
Assembled on order (3-5 days)
5 meter
2 meter
110 mm
steel
27 kg
black
powder coated
Assembled on order (3-5 days)
7 meter
2 meter
110 mm
steel
33 kg
black
powder coated
Assembled on order (3-5 days)
9 meter
2 meter
110 mm
steel
40 kg
black
powder coated
Assembled on order (3-5 days)
4 meter
3 meter
104 mm
steel
22 kg
black
powder coated
Assembled on order (3-5 days)
5 meter
3 meter
104 mm
steel
25 kg
black
powder coated
Assembled on order (3-5 days)
6 meter
3 meter
104 mm
steel
28 kg
black
powder coated
Assembled on order (3-5 days)
7 meter
3 meter
104 mm
steel
32 kg
black
powder coated
Assembled on order (3-5 days)
8 meter
3 meter
104 mm
steel
35 kg
black
powder coated
Assembled on order (3-5 days)
9 meter
3 meter
104 mm
steel
39 kg
black
powder coated
Assembled on order (3-5 days)
10 meter
3 meter
104 mm
steel
42 kg
black
powder coated
Assembled on order (3-5 days)
11 meter
3 meter
104 mm
steel
45 kg
black
powder coated
Assembled on order (3-5 days)
12 meter
3 meter
104 mm
steel
49 kg
black
powder coated
Assembled on order (3-5 days)
14 meter
3 meter
104 mm
steel
52 kg
black
powder coated
Assembled on order (3-5 days)
14 meter
4 meter
104 mm
steel
55 kg
black
powder coated
Assembled on order (3-5 days)
15 meter
4 meter
104 mm
steel
58 kg
black
powder coated
Assembled on order (3-5 days)
16 meter
4 meter
104 mm
steel
61 kg
black
powder coated
Assembled on order (3-5 days)
17 meter
4 meter
104 mm
steel
64 kg
black
powder coated
Assembled on order (3-5 days)
20 meter
4 meter
104 mm
steel
73 kg
black
powder coated
Assembled on order (3-5 days)
420 x 115 x 20 mm
steel
1.23 kg
black
powder coated
Assembled on order (3-5 days)


English (United Kingdom)